Report Number 3

The goal of the meeting was to present updated plans of the two selected design options for the new Greeley West High School building and site. These options include more specific programmatic layouts including the locations of all spaces and their adjacencies to other departments. After presenting the two options, the DAG was divided into three groups to evaluate the options and make a recommendation on the preferred solution. 

2020_02-26_GWHS_DAG 04 Meeting Minutes.pdf, 2.01 MB; (Last Modified on March 2, 2020)